5% of the build contract, minimum R12,000
Format: optional, signed before the build starts
What it is: We coordinate your build from start to handover, with a check at each stage.
What it does: Mistakes are caught while they are still cheap to fix, materials are tracked, and the room is built as designed.
What you get: A gate check and signed record at each of the seven stages, a shared build log (hold points, stock, site access), regular updates, and the final walkthrough. Paid 50% before the build starts, 25% at Gate 3 (halfway), 25% at Gate 6 (handover).
The order of work and a checkpoint at each stage, the roof before tiling and the plumbing before that; trades that can run side by side; stock tracking and site access; and a final readiness check of lights, water and geyser. Finishes and appliance choices are included. Your architect, engineer and contractors stay responsible for certification, compliance and workmanship.